ENGINEERING CASE

Cases

Anhui Water Plant
Addtime: 2023-12-17 Hits: 189

Project overview

1. Design scale: The urban water supply project of  Economic Development Zone Port Ecological Industry Park Waterworks has a design scale of 60000 m3/d, with a design scale of 30000 m3/d for Phase I (current) and 30000 m3/d for Phase II (new), covering a total area of about 20 acres. After the completion of the project, the water quality meets the indicators specified in the "Hygienic Standards for Secondary Water for Domestic Use" (GB5749-2006).


2. The water treatment process adopts "flocculation sedimentation tank+V-shaped filter tank+disinfection process", and the sludge treatment process adopts "sludge concentration+mechanical dewatering" process. The main structures include: flocculation sedimentation tank, V-shaped filter tank, clear water tank, drainage tank, sludge discharge tank, sludge concentration tank, sludge dewatering room, etc.